Skip to content
  • X

Subscribe

Magazine | Newsletters
  • Food & Drink
  • News
  • Culture
  • Style
  • Home
  • Family
  • Wellness
  • Things to Do
  • Travel
  • Best of NoVA
  • Best Restaurants
  • Top High Schools
  • In This Issue
  • Home
    • News
  • New HOT Toll Lanes on I-66 on Track to Open By December
traffic on a highway
  • News

New HOT Toll Lanes on I-66 on Track to Open By December

The new express lanes will require drivers to have at least two passengers in the car to qualify to use the lanes

By Jon Simkins August 19, 2022 at 2:41 pm

A $3.7 billion construction project designed to widen I-66 and add new express lanes is drawing to a close, an on-time completion for a historically large initiative that kicked off five years ago.

The heavily congested, 22.5-mile highway will soon see some relief in the form of the addition of high-occupancy toll, or HOT, lanes that run from Gainesville to the Beltway, the Washington Post reported.

As part of the new traffic pattern, which is expected to be fully operational in December, three non-toll lanes will continue to operate on both sides of the highway, which will be joined, on both eastbound and westbound sides, by two HOT lanes that will connect with the peak-direction toll lanes that were unveiled in 2017.

“We have billions of dollars’ worth of work, and we’re delivering it on time, with everybody working very hard together in some very unusual times,” Susan Shaw, VDOT’s director of megaprojects, told the Post.

Motorists will still be able to select between the three free lanes or the new HOT lanes, which will adjust in price based on traffic conditions while remaining free for motorcyclists, buses, and carpoolers.

One significant change, however, is the addition of a second passenger — a total of three in the vehicle — that will be needed to qualify for the free high-occupancy vehicle rules. Just one passenger was needed in the previous criteria. 

The first phase of the project’s rolling launch will begin to be operational on August 25, when a new ramp and bridge will usher motorists between I-66 and the Capital Beltway. Traffic patterns are expected to evolve as new sections open.

A total of 63 bridges and overpasses and 12 interchanges have been included in the construction project, the Post reported.

Feature image, roza/stock.adobe.com

For more stories like this, subscribe to our News newsletter.

Trending in NoVA

Fredericksburg’s Belvedere Plantation Owners Confirm Data Center Plans

A Scenic, Historic Horse Farm Is on the Market in Purcellville

16 September Events in Northern Virginia and Washington, DC

Big Dig of Northern Virginia Returns to Ashburn

Ebbitt House Is Expected to Open in October at Reston Station

things to do newsletter

Our Top Stories In Your Inbox

Our newsletters delivered weekly.

Subscribe

Feeds

RSS Feed Follow in Feedly

You May Also Like

emergency response teams begin preparing triage areas outside of the pentagon on 9/11

NoVA Daily: Crossing Guards Reinstated at Fairfax County High Schools, Northern Virginians Share 9/11 Experiences

People watching and climbing at Sportrock Climbing Center

Sportrock Climbing Center to Open at Fair Oaks Mall

crossing guard flags with a school bus in the background

Crossing Guards Are Back Temporarily at Fairfax County High Schools After Student Was Hit by a Car

  • X

Company

  • About Us
  • Advertising
  • Writer’s Guidelines
  • Internships
  • Terms of Use

Magazine

  • Magazine
  • Subscription
  • Newsletter
  • Back Issues

Talk to Us

  • Contact Us
  • Submit an Event
  • Twitter
  • Facebook
  • Instagram

Shopping

  • Subscription
  • Back Issues
  • Plaques
  • Realtor Client Gift Subscriptions

On Newsstands Now

september 2026 cover

Copyright © 2026 Northern Virginia Magazine

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply. Hey AI.