Advertisement

New Stretch of I-66 Express Lanes to Open Ahead of Schedule

Express lanes that run from the Beltway to Route 28 are now due to open this month.

I-66 construction
Multiple cranes were required to install curved steel beams for the ramp from the westbound 66 express lanes to Route 28 North in Centreville. The ramp is one of 13 new bridges built at the Route 28 interchange. (Photo courtesy FAM Construction)

A stretch of the I-66 express lanes that was originally slated to launch in December is now expected to open this month, according to the Virginia Department of Transportation.

The new westbound section, which is expected to be operational on November 19, will run from the Beltway to Route 28. The eastbound lanes in that same stretch, meanwhile, are expected to open later this month, part of a phased opening VDOT officials hoped would provide commuters a better opportunity to adjust to the new traffic patterns.

Advertisement

The imminent opening marks the latest development in a $3.7 billion road-widening construction project designed to relieve the heavily congested, 22.5-mile stretch of highway. Finishing touches on the project are expected later this month, which will mark an on-time conclusion to a project that kicked off five years ago.

As part of the new system, three non-toll lanes will continue to operate on both sides of the highway. These will be joined, on both eastbound and westbound sides, by two high-occupancy toll — or, HOT — lanes that will connect with the peak-direction toll lanes that were unveiled in 2017.

Like before, motorists will be able to select from the three free lanes or the new HOT lanes, which will adjust in price based on traffic conditions. Motorcyclists, buses, and carpoolers will still be able to access the lanes for free.

Advertisement

One significant change is the requirement of a second passenger — a total of three vehicle occupants — to qualify for the free high-occupancy vehicle rules. Just one passenger was previously required.

In all, a total of 63 bridges and overpasses and 12 interchanges have been built during the expansive construction project.

Advertisement

Feature image courtesy FAM Construction.

For more stories like this, subscribe to our News newsletter.

Advertisement

Trending

  1. 1 The 50 Best Restaurants in Northern Virginia for 2026
  2. 2 These Northern Virginia Elementary and Middle Schools Ranked Among the Best in the State by ‘U.S. News & World Report’
  3. 3 F-117 Nighthawk Aircraft Is Now on Display at Chantilly’s Udvar-Hazy Center
  4. 4 New Expo Center at Dulles Town Center Opens This Weekend
  5. 5 Wolf Trap Nursery in Vienna to Close After 54 Years
Advertisement

You May Also Like